High-voltage cable termination has traditionally been carried out on site. Inside turbine towers. On substation yards. Across BESS parks. It requires specialist HV Jointers, controlled environments, extended site access, and time. Every variable introduced in the field increases the risk of partial discharge, insulation failure, or commissioning delay.
For projects where the same connection is repeated at scale, such as dropper cables and tower cables in offshore wind, the cumulative exposure to these variables is significant.
Reynard’s ready-terminated cable service moves termination from the field into the factory.
Every cable set is assembled, jointed, and electrically tested in our own dedicated facility in Nieuw-Vennep, near Amsterdam, under controlled temperature and humidity, using precision tooling and calibrated processes, with the full attention of certified HV Jointers.
Cables arrive on site terminated, tested, and certified. Pull, connect, and move on to the next tower.
The same applies to substations and BESS parks. Wherever HV cables need to be connected, factory termination simplifies the process.
Dropper and tower cables
The most common application for ready-terminated cables. In offshore wind, these connections are repeated across every turbine in a wind farm. Factory assembly ensures identical build quality across the entire batch.
Substation interconnections
Links between transformers, switchgear, and busbars on onshore and offshore substations. Pre-terminated cables eliminate the need for specialist jointers and climate-controlled tents on the substation yard.
BESS park cabling
String and collector cables connecting battery containers, inverters, and transformers. Factory termination reduces the balance-of-plant installation window and removes a dependency from the critical path.
Controlled quality
Every joint is made under identical factory conditions. No exposure to weather. No risk of contamination. Every condition managed. For series-produced cable sets, this means standardised, repeatable quality across every unit.
In-house testing up to 160 kV
Every assembly is electrically verified in our purpose-built high-voltage test facility before it leaves our building. Each cable is tested, documented, and certified. Performance is proven, not assumed.
Engineered to your specification
Each cable set is configured to your exact requirements. Voltage class, cable type and cross-section, length (3 to 150 metres), routing, connector type, and accessory brand.
Compatible with major brands
We work with Prysmian, TKF, NKT, TE Connectivity, Pfisterer, and others on request. We can also support the procurement of cables and components, ensuring full compatibility between all elements.
Complete delivery
Cables are delivered as complete units. No separate shipments, no missing components, no dependency on multiple suppliers. Warehousing and phased delivery can be aligned with your project planning.
Project context
Cable specification
Termination and interfaces
Installation environment
Compliance and verification
Required certifications and testing or documentation requirements.
Logistics and delivery
Storage, staging, and delivery requirements.
Phased delivery or just-in-time planning.
Optional warehousing support by Reynard.
Choosing Reynard means choosing excellence. I’m not just connecting turbines to cables. I’m connecting the future – homes, cars, all to renewable energy. Let’s make it happen, together.
Your form entry has been saved and a unique link has been created which you can access to resume this form.
Enter your email address to receive the link via email. Alternatively, you can copy and save the link below.
Please note, this link should not be shared and will expire in 30 days, afterwards your form entry will be deleted.