Mobile High-Voltage Testing
Up To 400kV Terminations
Over 100 Projects Completed
Over 10,000 Cables Terminated
High-voltage testing shouldn't slow your project down.
Reynard's mobile testing units bring advanced diagnostic and commissioning capabilities directly to your project location. Whether you're commissioning an offshore wind farm, energising a new substation or investigating a cable fault, our specialist teams and mobile test equipment are ready to deploy.
Designed for demanding field conditions, our mobile testing units provide reliable, efficient testing where it's needed most.
Who this service is for
Offshore wind developers
Utilities and grid operators
EPC contractors
Cable installation contractors
Industrial asset owners
Renewable energy developers
Mobile testing solutions
Offshore Mobile Testing Unit
Designed for offshore deployment, our containerised testing unit supports offshore wind projects with resonance testing and commissioning of cable systems up to 66 kV. The unit is optimised for vessel and offshore platform operations, helping minimise offshore time while delivering reliable, documented results.
Onshore Mobile Testing Unit
Our new truck-mounted testing unit brings high-voltage testing directly to substations, BESS projects, wind farms, solar parks and industrial facilities. Designed for rapid mobilisation, it supports cable testing up to 400 kV, reducing the need to transport equipment or delay commissioning.
What Reynard delivers
Depending on your project requirements, Reynard provides:
- AC Resonance Testing
- VLF Testing
- Partial Discharge Measurement
- DAC Testing
- TDR Fault Location
- Insulation Resistance Testing
- Tan Delta Measurement
- Commissioning support
- Test reporting and certification
Why Reynard
Testing is about more than equipment—it's about understanding high-voltage systems.
Reynard combines advanced mobile testing technology with practical installation experience. Our specialists don't just measure results; they understand what those results mean and how they affect the safe operation of your cable system.
With dedicated mobile testing units for both offshore and onshore projects, we bring specialist testing capabilities directly to your site, helping you move efficiently towards energisation.
Need specialist high-voltage testing at your project site?
Our mobile testing units are ready to support offshore and onshore projects with fast mobilisation, advanced diagnostics and reliable test reporting.
FAQ
What testing services does Reynard provide?
Reynard provides a full range of high-voltage testing services, including AC Resonance Testing, VLF Testing, Partial Discharge (PD) Measurement, DAC Testing, TDR Fault Location, insulation resistance testing, Tan Delta measurements and commissioning support.
Do you provide testing for both offshore and onshore projects?
Yes. Reynard operates dedicated mobile testing units for both environments. Our offshore testing unit supports cable systems up to 66 kV, while our truck-mounted onshore testing unit is designed for cable systems up to 400 kV.
Can Reynard perform testing as a standalone service?
Yes. Our mobile testing units can be deployed independently or as part of a wider Reynard project scope. We regularly support EPC contractors, utilities, cable installers and asset owners with commissioning, verification and diagnostic testing.
When should high-voltage testing be carried out?
High-voltage testing is typically performed after cable installation, following repairs, before energisation or as part of condition assessments for existing assets. It verifies the integrity of the cable system and helps identify potential issues before they lead to failures.
Why choose Reynard for mobile high-voltage testing?
Our testing specialists combine advanced mobile testing equipment with years of practical experience in high-voltage cable installation and commissioning. That means we don't just provide test results—we understand how high-voltage systems behave in the field and help customers move safely towards energisation.
Noirmoutier Offshore Wind Farm
View project
Greater Changhua
View project
Baltic Eagle
View project
Saint-Brieuc Offshore Wind Farm
View project
Gruissan Offshore Wind Farm
View project
Courseulles-sur-Mer Offshore Wind Farm
View projectLatest news and insights
Where Is High-Voltage Cable Jointing Used?
Introduction Whenever electricity travels from one piece of electrical equipment to another, the connection must be made safely…
Read more
Offshore Wind Energisation: What Happens After HV Cable Testing?
An offshore wind farm is not built overnight. What began a decade ago as seabed surveys and environmental…
How Do We Prevent HV Work from Delaying Project Delivery?
The path from mechanical completion to a live grid connection is often the most tense milestone in utility-scale…
The BESS Bottleneck: How Pre-Terminated HV Cables are Fast-Tracking Europe’s Grid-Scale Storage
The Industrialization of Energy Storage The European energy landscape is shifting. To stabilize a grid increasingly powered by…
Why BESS Projects Slow Down – And How to Keep Them Moving
The Invisible Friction: Avoiding BESS Project Delays in the Balance of Plant A large-scale Battery Energy Storage System…