Offshore Termination & Testing
Up To 400kV Terminations
Over 100 Projects completed
Over 10,000 Cables terminated
An offshore wind farm only starts generating power once every high-voltage connection has been safely completed, tested and approved. This final phase leaves no room for error. Weather windows are limited, vessel time is expensive, and every delay can affect the entire project schedule. Reynard specialises in the critical high-voltage connections that bring offshore wind farms into operation. From array cables and export systems to offshore substations, our certified high-voltage specialists deliver cable terminations up to 525 kV.
Whether you're developing, building or commissioning offshore energy infrastructure, Reynard supports projects that require specialist high-voltage expertise.
Who this service is for
Offshore wind developers
EPCI contractors
Cable installation contractors
Transmission system operators
Offshore substation contractors
Cable manufacturers
Typical applications
Array cable termination
Termination and testing of 33 kV and 66 kV inter-array cable systems inside wind turbine foundations.
Export cable connections
High-voltage terminations between export cables, offshore substations and landfall installations.
Offshore substations
Installation and testing of transformer, GIS and switchgear connections on fixed and floating offshore substations.
What Reynard delivers
Every offshore project is different, but our scope typically includes
- Cable pull-in
- High-voltage cable terminations
- Joint installation
- High-voltage testing
- Partial discharge diagnostics
- Resonance and VLF testing
- TDR fault location
- Commissioning support
- Test documentation
- Dedicated project management
- Certified HV jointers
- Project-specific RAMS and method statements
Why Reynard
Offshore projects demand more than skilled technicians. They require planning, quality control and complete confidence that every connection will perform as intended.
For more than a decade, Reynard has supported offshore wind projects around the world, helping connect thousands of turbines through safe, reliable high-voltage workmanship.
Our own HV Academy, specialist tooling, mobile test equipment and experienced project teams allow us to deliver consistent quality, wherever the project is located.
Planning an offshore wind project?
Let's discuss how Reynard can support your high-voltage connections.
You got questions? we have answers
What voltage levels does Reynard work with?
Our offshore teams support cable systems from 33 kV array cables through to 525 kV transmission and HVDC infrastructure.
Can Reynard provide testing as well as installation?
Yes. Reynard provides both cable termination and independent high-voltage testing, including resonance testing, VLF, partial discharge diagnostics and commissioning support.
Can Reynard work as a subcontractor?
Yes. We regularly work as a specialist subcontractor for EPC contractors, cable installation companies and offshore wind developers.
Noirmoutier Offshore Wind Farm
View project
Greater Changhua
View project
Baltic Eagle
View project
Saint-Brieuc Offshore Wind Farm
View project
Gruissan Offshore Wind Farm
View project
Courseulles-sur-Mer Offshore Wind Farm
View projectLatest news and insights
Where Is High-Voltage Cable Jointing Used?
Introduction Whenever electricity travels from one piece of electrical equipment to another, the connection must be made safely…
Read more
Offshore Wind Energisation: What Happens After HV Cable Testing?
An offshore wind farm is not built overnight. What began a decade ago as seabed surveys and environmental…
How Do We Prevent HV Work from Delaying Project Delivery?
The path from mechanical completion to a live grid connection is often the most tense milestone in utility-scale…
The BESS Bottleneck: How Pre-Terminated HV Cables are Fast-Tracking Europe’s Grid-Scale Storage
The Industrialization of Energy Storage The European energy landscape is shifting. To stabilize a grid increasingly powered by…
Why BESS Projects Slow Down – And How to Keep Them Moving
The Invisible Friction: Avoiding BESS Project Delays in the Balance of Plant A large-scale Battery Energy Storage System…