Ready-Terminated & Tested HV Cables
Up to 400KV Terminations
Over 100 Projects completed
Over 10,000 Cables terminated
The quality of a high-voltage connection starts long before installation.
By terminating and testing cables in a controlled environment before they arrive on site, Reynard helps reduce installation time, minimise project risk and improve quality.
Ready-Terminated & Tested HV Cables
Our Ready-Terminated & Tested (RTT) HV Cables are manufactured to your exact specification, assembled by experienced high-voltage specialists and electrically tested in our own HV Test Room before delivery. The result is a cable that arrives ready for installation, with complete documentation and full traceability.
Whether your project is offshore or onshore, RTT Cables reduce the amount of critical work that needs to be carried out in the field.
RTT Cables are ideal for projects where installation time, quality and predictability are critical.
Who this service is for
Offshore wind farms & substations
Battery Energy Storage Systems (BESS)
Onshore substations
Solar parks
Industrial high-voltage connections
Typical applications
Offshore wind
Tower and dropper cables, array cable assemblies and offshore substation connections that arrive on site ready for installation.
Onshore energy infrastructure
Factory-terminated cable assemblies for substations, BESS installations, renewable energy projects and industrial high-voltage connections.
Project-specific cable solutions
Custom-built cable assemblies manufactured to your project requirements, complete with testing, documentation and traceability.
What Reynard delivers
Every RTT Cable is manufactured and prepared to your project specification. Our process includes:
- Engineering review
- Cable preparation and assembly
- Factory termination
- Electrical testing in our HV Test Room
- Inspection and quality control
- Complete documentation and traceability
- Secure packaging for transport and installation
Why Reynard
Moving critical termination work from the construction site to a controlled production environment improves quality, consistency and installation efficiency.
At our facility in Nieuw-Vennep, engineering, production and testing come together under one roof. Every RTT Cable is terminated by experienced HV specialists and electrically tested before delivery, providing confidence that it is ready to perform from the moment it reaches site.
Looking for Ready-Terminated & Tested HV cables?
Let’s discuss your project requirements.
FAQ
What are Ready-Terminated & Tested HV Cables?
RTT Cables are high-voltage cable assemblies that are terminated, electrically tested and documented before delivery. Moving critical termination work to a controlled environment reduces installation time, improves quality and minimises project risk.
Can RTT Cables be used for both offshore and onshore projects?
Yes. Reynard supplies RTT Cables for offshore wind farms, offshore and onshore substations, Battery Energy Storage Systems, renewable energy projects and industrial high-voltage installations.
Are all cables tested before delivery?
Yes. Every RTT Cable is electrically tested in Reynard's own HV Test Room before leaving our facility. Test results and supporting documentation form part of the delivery package.
Can RTT Cables be manufactured to our project specification?
Yes. Every cable assembly is produced to the required cable type, length, accessories and connection interfaces so it arrives ready for installation.
What are the benefits of RTT Cables?
RTT Cables reduce installation time, improve quality consistency, minimise work in challenging site conditions and reduce the risk of delays during commissioning.
Noirmoutier Offshore Wind Farm
View project
Greater Changhua
View project
Baltic Eagle
View project
Saint-Brieuc Offshore Wind Farm
View project
Gruissan Offshore Wind Farm
View project
Courseulles-sur-Mer Offshore Wind Farm
View projectLatest news and insights
Where Is High-Voltage Cable Jointing Used?
Introduction Whenever electricity travels from one piece of electrical equipment to another, the connection must be made safely…
Read more
Offshore Wind Energisation: What Happens After HV Cable Testing?
An offshore wind farm is not built overnight. What began a decade ago as seabed surveys and environmental…
How Do We Prevent HV Work from Delaying Project Delivery?
The path from mechanical completion to a live grid connection is often the most tense milestone in utility-scale…
The BESS Bottleneck: How Pre-Terminated HV Cables are Fast-Tracking Europe’s Grid-Scale Storage
The Industrialization of Energy Storage The European energy landscape is shifting. To stabilize a grid increasingly powered by…
Why BESS Projects Slow Down – And How to Keep Them Moving
The Invisible Friction: Avoiding BESS Project Delays in the Balance of Plant A large-scale Battery Energy Storage System…