Moray East Onshore Substations

Table of Contents

The three substations of Moray East Offshore Windfarm were prepared onshore. V&SH Offshore performed the pulling, routing, termination and testing of 57 HV cables and 9 FO cables establishing the circuits for the offshore connections between the substations and the strings.

Onshore Preparation

By performing as much of this scope onshore, both costs and risk for our client could be minimized in comparison with execution offshore. In addition, V&SH was able to identify and solve multiple matters which could result in offshore implications due to our exceptional experience in offshore terminations

“Being able to assist our clients with our knowledge and experience, even if it outreaches our scope, is what we as V&SH Offshore are proud of.”

Share this article

More articles
Phones showing the Reynard toolbox suite app
Blog
Our Proprietary App: Reynard Toolbox Suite

Reynard Toolbox Suite: Powering Wind Energy Projects with Precision In the fast-evolving world of wind energy, precision, safety, and efficiency are crucial. That’s why I created the Reynard Toolbox Suite—a

Career
opportunities

High-Voltage
Jointer

High-Voltage
Training

CONTACT ME

I am
reynard

DOWNLOAD BROCHURE
Step 1 of 3