Horns Rev 3 Wind Farm

A yellow helicopter moving towards wind turbines at sea on a grey day

The offshore termination and testing scope of the Horns Rev 3 wind farm was executed by Reynard (Previously V&SH Offshore). Our scope included the stripping, termination and testing works of all 49 offshore wind turbines. By means of connecting the Array cables to a Dropper cable using a straight joint. During the execution of this […]

Moray East Onshore Substations

image of energy plant

The three substations of Moray East Offshore Windfarm were prepared onshore. Reynard (Previously V&SH Offshore) performed the pulling, routing, termination and testing of 57 HV cables and 9 FO cables establishing the circuits for the offshore connections between the substations and the strings. Onshore Preparation By performing as much of this scope onshore, both costs […]

Windpark Fryslan

a man in orange safety clothing walking up stairs towards a yellow base of a wind turbine

Offshore wind High Voltage specialists Reynard (Previously V&SH Offshore) have been awarded the contract by Van Oord Offshore Wind Projects B.V. to perform all array cable Terminations and Testing work at Windpark Fryslân, currently being the largest inland windpark in the world. The 89 wind turbines at Windpark Fryslân contain a 33 kV inter array […]

Borssele III and IV

Loading of wind turbines at the docs with clear sky

Offshore Wind High Voltage specialists Reynard (Previously V&SH Offshore) have been awarded the contract by Van Oord Offshore Wind to perform all array cable Terminations and Testing work at the Borssele III & IV offshore wind farm. A total of 77 wind turbines will be connected to the Offshore High Voltage Substation. Director of Reynard […]

East Anglia One

A row of wind turbines at sea during a clear day

Reynard (Previously V&SH Offshore) have been awarded the contract to perform all array cable Terminations and Testing work at East Anglia One Wind Farm. The scope of the work entails the 66kV array cable terminations in all 102 turbines, as well as the installation of the custom-designed cable management system and testing of the High […]